ALLEGRA BOVERMAN/Staff photo. Gloucester Daily Times. Gloucester: The Harborwalk area at the I-4, C-2 site is still under construction. A boardwalk with a built-in ramp is being built there. Dave Mason, lower left, works on Thursday.
120712ABOHARBORWLK